Special tab
Figure: "Data Administration" dialog, "Cost models" category, "Special" tab
"Assignments" group:
Option | |
Manufacturing Processes | Multiple technology and/or manufacturing processes can be linked and multiple ones can be actively assigned. You cannot assign the same technology/manufacturing process multiple times. If a cost model with assigned technology/manufacturing process is inserted in a project, you can use the "Technology" mode for the technology/manufacturing process, provided that calculation parameters have been set. |
Additional costs | Multiple additional costs can be added and multiple ones be actively assigned. You cannot assign the same additional cost multiple times. When additional costs are assigned to a project, the "Technology" calculation mode becomes available for them, provided that calculation parameters have been set. |