Direct Material Cost
The direct material costs (DMatC) can be assigned to a project directly. The calculation of these costs depends on the Material type and the Procurement Type.
The direct material costs are calculated by the:
- Direct material costs after Material type and Procurement Type
- Inbound Logistics Cost
Display Direct Material Costs
Direct material costs are shown in the Details ► Cost Summary view schema (combobox) and the Key Figures ► Production Cost - Detailed view schema (combobox).
Hint
When hovering the mouse over the abbreviated costs in the Key Figures view, a tooltip shows their full name.
Material type and procurement type
Both the Material type and the Procurement Type can be chosen for the material in the following views:
- in the Details ► »General Properties« view schema
- in the Structure ► »Production Cost - Detailed« view schema when navigating to the material level (see Level Navigation)
- in the Used Objects ► »Material« view schema