Direct Material Cost

The direct material costs (DMatC) can be assigned to a project directly. The calculation of these costs depends on the Material type and the Procurement Type.

The direct material costs are calculated by the:

 

Display Direct Material Costs

Direct material costs are shown in the Details ► Cost Summary view schema (combobox) and the Key Figures ► Production Cost - Detailed view schema (combobox).

Hint

When hovering the mouse over the abbreviated costs in the Key Figures view, a tooltip shows their full name.

 

Material type and procurement type

Both the Material type and the Procurement Type can be chosen for the material in the following views:

  • in the Details ► »General Properties« view schema
  • in the Structure ► »Production Cost - Detailed« view schema when navigating to the material level (see Level Navigation)
  • in the Used Objects ► »Material« view schema