Insert Processes
Processes that are required for manufacturing continue to be added to the part (piece) “Motor Shaft”. Related processes can be structured using the grouping. The grouping itself has no function in product costing.
The units are pre-configured in FACTON. If you want to enter a value in a different unit, you can toggle through different units using the selection list.
Further Information ► Toggle Unit
Sequence
Insert Grouping »Turning«
- In the Structure view, select »Motor Shaft«.
- In the ribbon, click on Edit ► Insert ► Grouping (Piece) to insert a grouping.
- Change the label to »Turning«.
Insert Setup Process and Process »Turning«
- Click Edit ► Insert ► Setup Process in the ribbon to insert a setup process.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
- In the Structure view, select the grouping »Turning«.
- Click Edit ► Insert ► Process in the ribbon to insert a process.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
Label | Setup Process - Turning |
Setup Time | 8 h / lot |
Label | Process – Turning |
Cycle Time | 1.2 min/cycle |
If you do not have knowledge of the cycle time for processes, FACTON provides you with cost models for calculating the cycle times.
Further Information ► Cost Models
Insert Process »Washing«
- In the Structure view, select »Motor Shaft«.
- Click Edit ► Insert ► Process in the ribbon to insert a process.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
Label | Washing |
Cycle Time | 700 s/cycle |
Manufacturing Method | Separating » Cleaning » Fluidic Cleaning |
Calculation | |
Yield per cycle | 100 pc / cycle |
Insert Process »Hardening«
- In the Structure view, select »Motor Shaft«.
- Click Edit ► Insert ► Process in the ribbon to insert a process.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
Label | Hardening |
Cycle Time | 21.6 s/cycle |
Calculation | |
Yield per cycle | 3 pc / cycle |
Insert Grouping »Grinding«
- In the Structure view, select »Motor Shaft«.
- In the ribbon, click on Edit ► Insert ► Grouping (Piece) to insert a grouping.
- Change the label to »Grinding«.
Insert Setup Process and Process »Grinding«
- Click Edit ► Insert ► Setup Process in the ribbon to insert a setup process.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
- In the Structure view, select the grouping »Grinding«.
- Click Edit ► Insert ► Process in the ribbon to insert a process.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
Label | Setup Process – Grinding |
Setup Time | 8 h / lot |
Manufacturing Method | Separating » Chipping with Geometrically Determined Cutting Edge (DIN 8589-0) » Turning (DIN 8589-11) |
Label | Process – Grinding |
Cycle Time | 0.8 min / cycle |
Insert Process »Washing & Preserve«
- In the Structure view, select »Motor Shaft«.
- Insert a Process with the label »Washing & Preserve«.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
Cycle Time | 700 s/cycle |
Calculation | |
Yield per cycle | 100 pc / cycle |
Insert Process »Remaining Dirt«
- In the Structure view, select »Motor Shaft«.
- Insert a Process with the label »Remaining Dirt«.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
Cycle Time | 30 min / cycle |
Calculation | |
Yield per cycle | 10,000 pc / cycle |
Insert Process »Packaging & Goods Leaving Inspection«
- In the Structure view, select »Motor Shaft«.
- Insert a Process with the label »Packaging & Goods Leaving Inspection«.
- In the Details ► Overview view schema (combobox), enter values for the following properties:
Cycle Time | 10 s / cycle |
Manufacturing Method | General Processes » Packaging |
Next step: Specify Processes