Extend Should Cost Calculation

  1. Select the should cost calculation in the Structure view.

    The Details view of your should cost calculation is shown.

  2. In the Details view ► Overview view schema (combobox), enter values for the following properties:
  3. Part number 16001
    Label Motorwelle
    Reference date 07/07/2017
    Carry Over Part
    Project Name Motor
    Project Number 10000
    Assumptions
    Number of Production Batches 4 lot / a
    SoP 1/1/2018
    EoP 07/31/2023
    Mode *Aggregate Costs
    Assumptions ► Quantity Adjustments
    Additional Production Quantity 500 pc / a
    Scrap Production Quantity 20 pc / a
    Assumptions ► Location Factors ► Business Days
    Miscellaneous Non-Business Days 2 d / a
    Holidays 11 d / a
    Assumptions ► Overhead and Scrap Rates
    Material Scrap Rate 2 %
    Manufacturing Scrap Rate 3 %
    Miscellaneous Overhead Cost Rate 2 %
    Assumptions ► Outbound Logistics
    Incoterms DDP (Delivered Duty Paid)
    Delivery Location World » Europe » Czech Republic » City of Prague
    Cost of Packaging 0,02 EUR / pc
    Transporting 0,06 EUR / pc
    Customs Duty 0,04 EUR / pc
    Assumptions ► Terms of Payment
    Payment Period 60 d
    Cash Discount Rate 2%
    Technical Data
    Supplier ABC
    Client CBA
    Calculation Maturity Degree Initial cost indication
    Measure Evaluation Scenario: IL 2-5
    Drawing Date 08/08/2016
    Drawing Number 16001a
    Drawing Revision Index a
  4. You can also attach files to the target cost calculation. Closedsee Attach Files and Hyperlinks

Next step: Insert Material