Extend Should Cost Calculation
- Select the should cost calculation in the Structure view.
The Details view of your should cost calculation is shown.
- In the Details view ► Overview view schema (combobox), enter values for the following properties:
Part number | 16001 |
Label | Motorwelle |
Reference date | 07/07/2017 |
Carry Over Part | |
Project Name | Motor |
Project Number | 10000 |
Assumptions | |
Number of Production Batches | 4 lot / a |
SoP | 1/1/2018 |
EoP | 07/31/2023 |
Mode | *Aggregate Costs |
Assumptions ► Quantity Adjustments | |
Additional Production Quantity | 500 pc / a |
Scrap Production Quantity | 20 pc / a |
Assumptions ► Location Factors ► Business Days | |
Miscellaneous Non-Business Days | 2 d / a |
Holidays | 11 d / a |
Assumptions ► Overhead and Scrap Rates | |
Material Scrap Rate | 2 % |
Manufacturing Scrap Rate | 3 % |
Miscellaneous Overhead Cost Rate | 2 % |
Assumptions ► Outbound Logistics | |
Incoterms | DDP (Delivered Duty Paid) |
Delivery Location | World » Europe » Czech Republic » City of Prague |
Cost of Packaging | 0,02 EUR / pc |
Transporting | 0,06 EUR / pc |
Customs Duty | 0,04 EUR / pc |
Assumptions ► Terms of Payment | |
Payment Period | 60 d |
Cash Discount Rate | 2% |
Technical Data | |
Supplier | ABC |
Client | CBA |
Calculation Maturity Degree | Initial cost indication |
Measure Evaluation Scenario: | IL 2-5 |
Drawing Date | 08/08/2016 |
Drawing Number | 16001a |
Drawing Revision Index | a |
Next step: Insert Material