Project-specific Machines
Define system-wide settings for project-specific machines in this interface.
Figure: Project-specific Machine interface
General | |
"Project-specific machines can be opened in the data administration" checkbox |
The option "Open in Data Administration" is available in the context menu of the project-specific machine (see image). There, the initial machine (as available in data administration) is shown. Figure: Context menu, project-specific machine |
"Insert machines from data administration as project-specific by default" checkbox |
The project-specific checkbox is then already activated in the Machine Assignment dialog. The machine is added as project-specific. Hint
Activate the checkbox if no machines with assignments to locations, shift models, etc. are used in Data Administration or if all machines are always added as project-specific machines. |
Allocation of machine cost | |
"Shift model capacity" checkbox | The allocation type listed under shift model is used. If no shift model has been specified, you can enter the value manually into the "Capacity - Shift model" value field. |
"Project utilization" checkbox | The actual annual utilization of the machine is taken into account. The machine hour rate is calculated for each year. |
"Average project utilization" checkbox | The allocation is calculated using the average utilization for the machine for the duration of the project. The machine hour rate remains constant throughout the duration of the project. |
"Default value" combobox: |
Select the default allocation method for project-specific machines.
|
"Calculate residual value" checkbox | Activate the checkbox to have the residual value of the machine dynamically calculated. |
"Deprecation begins with start of production (SoP)" checkbox | Define the depreciation period. If you activate the checkbox, the depreciation period will derive from the project period. Deactivate the checkbox to use the value from Data Administration (if available) as the default depreciation period. |
"Deprecation ends with end of production (EoP)" checkbox | |
"Calculate depreciation without residual value" checkbox | The residual value is not considered in the depreciation calculation. |
Utilization | |
"Include number of machines to calculate utilization" checkbox |
For the machine hourly rate calculation, the machine count is being taken into account. Further Information see Special tab. |
"Calculate the average utilization for project-specific machines on a monthly basis" checkbox |
The average utilization of a project is calculated on a monthly basis (default setting: on an annual basis). The manual utilization is also calculated monthly and added to the average project utilization. Activate the checkbox, if the start and end of production (SOP, EOP) dates lie within one year. |
Machine locations For machine hour rate calculation (Common Resource Costing), project-specific machines need to be linked to a location that carries location-dependent costs for consumption factors such as electricity, water, floor space. |
|
"Activate location selection on the project-specific machine" checkbox |
Activate the checkbox to set individual locations for each project-specific machine. When this checkbox is not activated, FACTON uses the location that has been defined in the Production Planning for the current year for all project-specific machines. You can view and modify location-specific consumption factors in the "Location" field in the project context menu. |
"Default value" combobox: |
Set the default location for project-specific machines. The machine location can also be set individually per year.
|
Reference types | |
"Reference" checkbox | Project-specific machines can be used as reference. |
"Reference copy" checkbox | Project-specific machines can be used as reference copy. |