Insert Processes
Processes that are required for manufacturing continue to be added to the part (piece) “Motor Shaft”. Related processes can be structured using the grouping. The grouping itself has no function in product costing.
The units are pre-configured in FACTON. If you want to enter a value in a different unit, you can toggle through different units using the selection list.
Further Information ► Toggle Unit
Sequence
Insert Grouping »Turning«
- In the Structure view, select
»Motor Shaft«.
- In the ribbon, click on Edit ► Insert ►
Grouping (Piece) to insert a grouping.
- Change the label to »Turning«.
Insert Setup Process and Process »Turning«
- Click Edit ► Insert ►
Setup Process in the ribbon to insert a setup process.
- Define the following properties in the Details view:
- In the Structure view, select the grouping
»Turning«.
- Click Edit ► Insert ►
Process in the ribbon to insert a process.
- Define the following properties in the Details view:
Label | Setup Process - Turning |
Setup time | 8 h / lot |
Label | Process – Grinding |
Cycle Time | 1.2 min/cycle |
If you do not have knowledge of the cycle time for processes, FACTON provides you with cost models for calculating the cycle times.
Further Information ► Cost Models
Insert Process »Washing«
- In the Structure view, select
»Motor Shaft«.
- Define the following properties in the Details view:
Label | Washing |
Cycle Time | 700 s/cycle |
Manufacturing Method |
|
Calculation | |
Yield per cycle | 100 pc / cycle |
Insert Process »Hardening«
- In the Structure view, select
»Motor Shaft«.
- Define the following properties in the Details view:
Label | Hardening |
Cycle Time | 21.6 s / cycle |
Calculation | |
Yield per cycle | 3 pc / cycle |
Insert Grouping »Grinding«
- In the Structure view, select
»Motor Shaft«.
- In the ribbon, click on Edit ► Insert ►
Grouping (Piece) to insert a grouping.
- Change the label to »Grinding«.
Insert Setup Process and Process »Grinding«
- Click Edit ► Insert ►
Setup Process in the ribbon to insert a setup process.
- Define the following properties in the Details view:
- In the Structure view, select the grouping
»Grinding«.
- Click Edit ► Insert ►
Process in the ribbon to insert a process.
- Define the following properties in the Details view:
Label | Setup Process – Grinding |
Setup time | 8 h / lot |
Manufacturing Method |
|
Label | Process – Grinding |
Cycle Time | 0.8 min / cycle |
Insert Process »Washing & Preserve«
- In the Structure view, select
»Motor Shaft«.
- Insert a
Process with the label »Washing & Preserve«.
- Define the following properties in the Details view:
Cycle Time | 700 s/cycle |
Calculation | |
Yield per cycle | 100 pc / cycle |
Insert Process »Remaining Dirt«
- In the Structure view, select
»Motor Shaft«.
- Insert a
Process with the label »Remaining Dirt«.
- Define the following properties in the Details view:
Cycle Time | 30 min / cycle |
Calculation | |
Yield per cycle | 10,000 pc / cycle |
Insert Process »Packaging & Goods Leaving Inspection«
- In the Structure view, select
»Motor Shaft«.
- Insert a
Process with the label »Packaging & Goods Leaving Inspection«.
- Define the following properties in the Details view:
Cycle Time | 10 s / cycle |
Manufacturing Method |
|
Next step: Specify Processes