Create Cost Estimate (Valuation: Estimation ∼)
The calculation structure is built based on the bill of material. In the cost estimation, you can add costs in the estimation valuation to the calculation elements to detect cost indicators early on and quickly create a rough should cost calculation.
In estimation valuation, it is not possible to add further calculation elements to specify your calculation structure. Generally, sub-elements are not considered in the calculation. These sub-elements are grayed-out, , since they are inactive.
Aggregation valuation is set by default for the following calculation elements that you insert into the structure for the first time:
-
Should Cost Calculation
-
Assembly
-
Part
-
Process
-
Setup Process
For these elements, you can additionally set the estimation valuation to insert estimation costs in the Details view.
Next step: Create Should Cost Calculation