Extend Should Cost Calculation

  1. Select the should cost calculation in the Structure view.

    The Details view of the Motor Shaft is shown.

  2. In the Details view, enter additional properties:
    General
    Label»Motor Shaft«
    Part Number16001
    Carry Over PartSpecify, whether this is an identical part that has already been calculated, or a new element.yes
    SupplierABC
    ClientCBA
    Project NameMotor
    Project Number10000
    Reference Date7/4/2016
    PurposePrice Indication
    Calculation Maturity DegreeInitial Cost Indication
    Measure Evaluation ScenarioIL 2-5
    Technical Description
    Drawing NumberDrawing number of the construction drawing that is the basis of the calculation.16001a
    Drawing Revision Indexa
    Drawing Date8/8/2015
    Label (de)Motorwelle
    Label (en)Motor Shaft
    Production Planning
    Additional Production Quantity500 pc / a
    Scrap Production Quantity20 pc / a
    Number of Production Batches4 lot / a
    SoP1/1/2018
    EoP7/31/2023
    Location Factors
    Holidays11 d / a
    Miscellaneous Non Business Days2 d / a
    Overhead and Scrap Rates
    Material Scrap Rate2 %
    Manufacturing Scrap Rate3 %
    Logistics
    Conditions of DeliveryDelivered Duty Paid
    Delivery LocationCity of London
    Transport Costs0.06 EUR / pc
    Cost of Packaging0.02 EUR / pc
    Customs Duty0.04 EUR / pc
    Terms of Payment
    Payment Period60 d
    Cash Discount Rate2%
  3. You can also attach files to the should cost calculations. Closed
    See Attach Files and Hyperlinks

Next Step: Insert Material