Extend Should Cost Calculation
- Select the should cost calculation in the Structure view.
The Details view of the Motor Shaft is shown.
- In the Details view, enter additional properties:
General Label »Motor Shaft« Part Number 16001 Carry Over PartSpecify, whether this is an identical part that has already been calculated, or a new element. yes Supplier ABC Client CBA Project Name Motor Project Number 10000 Reference Date 7/4/2016 Purpose Price Indication Calculation Maturity Degree Initial Cost Indication Measure Evaluation Scenario IL 2-5 Technical Description Drawing NumberDrawing number of the construction drawing that is the basis of the calculation. 16001a Drawing Revision Index a Drawing Date 8/8/2015 Label (de) Motorwelle Label (en) Motor Shaft Production Planning Additional Production Quantity 500 pc / a Scrap Production Quantity 20 pc / a Number of Production Batches 4 lot / a SoP 1/1/2018 EoP 7/31/2023 Location Factors Holidays 11 d / a Miscellaneous Non Business Days 2 d / a Overhead and Scrap Rates Material Scrap Rate 2 % Manufacturing Scrap Rate 3 % Logistics Conditions of Delivery Delivered Duty Paid Delivery Location City of London Transport Costs 0.06 EUR / pc Cost of Packaging 0.02 EUR / pc Customs Duty 0.04 EUR / pc Terms of Payment Payment Period 60 d Cash Discount Rate 2%
Next Step: Insert Material