Extend Should Cost Calculation
- Select the should cost calculation in the Structure view.
The Details view of your should cost calculation is shown.
- Enter further property values in the Details > view scheme General Properties (combobox):
- Enter further property values in the Details > view scheme Assumptions (combobox):
- Enter further property values in the Details > view scheme Technical Data (combobox):
Part number | 16001 |
Reference date | 07/07/2017 |
Carry Over Part |
![]() |
Project Name | Motor |
Project Number | 10000 |
Number of Production Batches | 4 lot / a |
SoP | 1/1/2018 |
EoP | 07/31/2023 |
Quantity Adjustments | |
Additional Production Quantity | 500 pc / a |
Scrap Production Quantity | 20 pc / a |
Location Factors > Business Days | |
Miscellaneous Non-Business Days | 2 d / a |
Holidays | 11 d / a |
Overhead and Scrap Rates | |
Material Scrap Rate | 2 % |
Manufacturing Scrap Rate | 3 % |
Logistics Overhead Rate | 2.2 % |
Miscellaneous Overhead Cost Rate | 2 % |
Outbound Logistics | |
Incoterms | DDP (Delivered Duty Paid) |
Delivery Location | World > Europe > England |
Cost of Packaging | 0.02 EUR / pc |
Transporting | 0.06 EUR / pc |
Customs Duty | 0.04 EUR / pc |
Terms of Payment | |
Payment Period | 60 d |
Cash Discount Rate | 2% |
Technical Data | |
Supplier | ABC |
Client | CBA |
Calculation Maturity Degree | Initial cost indication |
Measure Evaluation Scenario | IL 2-5 |
Drawing Number | 16001a |
Drawing Date | 08/08/2016 |
Drawing Revision Index | a |
Next step: Insert Material