Extend Should Cost Calculation

  1. Select the should cost calculation in the Structure view.

    The Details view of your should cost calculation is shown.

  2. Enter further property values in the Details > view scheme General Properties (combobox):
  3. Part number 16001
    Reference date 07/07/2017
    Carry Over Part
    Project Name Motor
    Project Number 10000
  4. Enter further property values in the Details > view scheme Assumptions (combobox):
  5. Number of Production Batches 4 lot / a
    SoP 1/1/2018
    EoP 07/31/2023
    Quantity Adjustments
    Additional Production Quantity 500 pc / a
    Scrap Production Quantity 20 pc / a
    Location Factors > Business Days
    Miscellaneous Non-Business Days 2 d / a
    Holidays 11 d / a
    Overhead and Scrap Rates
    Material Scrap Rate 2 %
    Manufacturing Scrap Rate 3 %
    Logistics Overhead Rate 2.2 %
    Miscellaneous Overhead Cost Rate 2 %
    Outbound Logistics
    Incoterms DDP (Delivered Duty Paid)
    Delivery Location World > Europe > England
    Cost of Packaging 0.02 EUR / pc
    Transporting 0.06 EUR / pc
    Customs Duty 0.04 EUR / pc
    Terms of Payment
    Payment Period 60 d
    Cash Discount Rate 2%
  6. Enter further property values in the Details > view scheme Technical Data (combobox):
  7. Technical Data
    Supplier ABC
    Client CBA
    Calculation Maturity Degree Initial cost indication
    Measure Evaluation Scenario IL 2-5
    Drawing Number 16001a
    Drawing Date 08/08/2016
    Drawing Revision Index a
  8. You can also attach files to the target cost calculation.Closedsee Attach Files and Hyperlinks

Next step: Insert Material