Extend Should Cost Calculation
- Select the should cost calculation in the Structure view.
The Details view of your should cost calculation is shown.
- In the Details > Overview view schema (combobox), enter values for the following properties:
| Part number | 16001 |
| Label | Motorwelle |
| Reference date | 07/07/2017 |
| Carry Over Part |
|
| Project Name | Motor |
| Project Number | 10000 |
| Assumptions | |
| Number of Production Batches | 4 lot / a |
| SoP | 1/1/2018 |
| EoP | 07/31/2023 |
| Valuation | *Aggregate Costs |
| Assumptions > Quantity Adjustments | |
| Additional Production Quantity | 500 pc / a |
| Scrap Production Quantity | 20 pc / a |
| Assumptions > Location Factors > Business Days | |
| Miscellaneous Non-Business Days | 2 d / a |
| Holidays | 11 d / a |
| Assumptions > Overhead and Scrap Rates | |
| Material Scrap Rate | 2 % |
| Manufacturing Scrap Rate | 3 % |
| Miscellaneous Overhead Cost Rate | 2 % |
| Assumptions > Outbound Logistics | |
| Incoterms | DDP (Delivered Duty Paid) |
| Delivery Location | City of Prague |
| Cost of Packaging | 0,02 EUR / pc |
| Transporting | 0,06 EUR / pc |
| Customs Duty | 0,04 EUR / pc |
| Assumptions > Terms of Payment | |
| Payment Period | 60 d |
| Cash Discount Rate | 2% |
| Technical Data | |
| Supplier | ABC |
| Client | CBA |
| Calculation Maturity Degree | Initial cost indication |
| Measure Evaluation Scenario | IL 2-5 |
| Drawing Number | 16001a |
| Drawing Date | 08/08/2016 |
| Drawing Revision Index | a |
Next step: Insert Material