Tool

Description

Tools are manufacturing equipments that have a direct shaping effect on the workpiece to be machined, either by hand or in the machine. Tools are an important manufacturing equipment. Tools have a shorter operation life and a lower value than machines. In FACTON, you can specify whether the tool is to last over the production period and according to which cost allocation procedure the tool costs are to be allocated.

The tool costs are reflected in the

  • allocation maintenance cost of fixtures in the direct manufacturing cost and
  • allocation of investment costs and imputed interest in manufacturing costs.

Further Information Costing Schema

In FACTON, you can create the tools as master data in the Master Data workspace and define the purchase value, incidental acquisition costs and the »tool classification« to which they belong. The classification is used for the search in queries.

Tools can be grouped in:

  • hand tools for manual work,
  • machine tools, and
  • measuring tools.

Example

  • Injection molding tool which has been manufactured exclusively for the production of a specific injection molding part (is specific equipment).
    • The purchase value including incidental acquisition cost is EUR 100,100.00.
    • It has a calculated and calculation-relevant operation life of 100,000 cycles.

Insertion Positions

Unit

Tools have the unit »piece«.

Calculated values of the Chipping cost model:

You can find the basic properties of the tool in the Details view.

Toggle View Schema

  • You are in the Details, Structure, Key Figures, or Used Objects view.
  1. Click in the view schema combobox to the top right of a view.
  2. All view schemes for the selected view are shown.

  3. Click on the desired view schema.
  4. This switches the view schema.

    Alternative: Click on one of the icons right next to the combobox to activate the respective view schema.

Note

The »Overview« view schema summarizes all available view schemes for the selected calculation or calculation element in groups. This schema is only available via the combobox.

»Calculation« group

Valuation

Via the valuation, you can define the calculation mode.

You can choose between the following valuations:

Further Information Valuation

 

Hint Click on the plus (+) for further information.

»Cost Summary« group

»General Properties« group

The specific properties of the tool are listed below.

Equipment is specific

This checkbox lets you define whether the TOOL is process-specific or not.

Development Type

Select a development type for the tool. The following development types are predefined:

Development Type Key of the Development Type
New Development NEW
Adjustment Development ADJUSTED
Carry Over CO

Lead Time

Display and enter the lead time of the tool to define how far in advance planning has to be done for this tool.

Direct input is possible.

Order Date

Display/Select a date to define when a tool needs to be ordered before it can be implemented in the production.

Payment Date

Enter/Select the date as of which the tool needs to be paid.

Further Information »General Properties« group

»Technical Data« group

Tool Classification

The classification of tools can be individually defined in selection lists of the Master Data workspace.

Further Information Manage Selection Lists

The classifications created for tools and fixtures are provided in the Calculations workspace at the respective calculation element under Details ► Technical Data.

The classification of tools and fixtures allows you to search efficiently, rather than searching by name. FACTON provides you with the ability to search by classification.

Hint

When creating or editing elements in selection lists, you can decide whether you want to edit the name in one or more languages for each project element.

Further Information Multilingual Functionality

Further Information »Technical Data« group

Further Information

Click here for further information on each group.

»Master Data« group

Some calculation elements additionally have the »Master Data« view schema. For the tool, this view schema comprises the properties of the following groups/view schemes at a glance:

  • General
  • Acquisition Cost
  • Number of Tools
  • Investment
  • Imputed Interest
  • Maintenance
  • Allocation Method
  • Cost Allocation
  • Technical Description
  • Comments, Attachments and Links
  • Information

 

FACTON CMD Compatibility

Tools can be allocated under the following supported resources:

 

UI Name Internal Name Type Object Type
Lifetime ToolOperatingLife ResourceQuantityType Resource
Output over Operating Life OutputOverToolOperatingLife CalculationQuantityType Resource
Tool Classification ToolClassificationData TToolClassificationData Resource
Purchase Value ToolPurchaseValueAtPosition Money Resource

Table: Interface Properties - Tool

Note

If the »Operating Life« is set by the CMD cost model, the »Output over Operating Life« has to be provided, which is usually “ToolOperatingLife / Context.AbsolutePositionQuantityForAllocation”.

Vice versa, if the »Output over Operating Life« is set by the CMD cost model, the »Operating Life« should be defined as “OutputOverToolOperatingLife * Context.AbsolutePositionQuantityForAllocation”.