Direct Material Cost
The direct material costs (DMatC) can be assigned to a project directly. The calculation of these costs depends on the Material type and the Procurement Type.
The direct material costs are calculated by the:
- Direct material costs after Material type and Procurement Type
- Inbound Logistics Cost
Display Direct Material Costs
Direct material costs are shown in the Details ► Cost Summary and the Key Figures view.
Hint
When hovering the mouse over the abbreviated costs in the Key Figures view, a tooltip shows their full name.
Material type and procurement type
Both the Material type and the Procurement Type can be chosen for the material in the following views:
- Details
- Structure in view schema »Production Cost - Detailed« when navigating to the material level (see Level Navigation)
- Used Objects in view schema »Material«