Extend Should Cost Calculation
- Select the should cost calculation in the Structure view.
The Details view of your should cost calculation is shown.
- In this Details view, enter the following values:
Part Number 16001 Label (de) Motorwelle Label (en) Motor Shaft Reference Date 07/07/2017 Carry Over Part Project Name Motor Project Number 10000 Assumptions Number of Production Batches 4 lot / a SoP 01/01/2018 EoP 07/31/2023 Valuation Aggregation Assumptions ► Quantity Adjustments Additional Production Quantity 500 pc / a Scrap Production Quantity 20 pc / a Assumptions ► Location Factors ► Business Days Miscellaenous Non-Business Days 2 d / a Holidays 11 d / a Overhead and Scrap Rates Material Scrap Rate 2 % Manufacturing Scrap Rate 3 % Miscellaneous Overhead Cost Rate 2 % Outbound Logistics Incoterms DDP (Delivered Duty Paid) Delivery Location World » Europe » Czech Republic » City of Prague Cost of Packaging 0.02 EUR / pc Transport 0.06 EUR / pc Customs 0.04 EUR / pc Terms of Payment Payment Period 60 d Cash Discount Rate 2 % Technical Data Supplier ABC Client CBA Calculation Maturity Degree Initial Cost Indication Measure Evaluation Scenario IL 2-5 Drawing Date 08/08/2016 Drawing Number 16001a Drawing Revision Index a
Next step: Insert Material