Support

support@facton.com
+49 1805-FACTON
Customer Portal

Imprint

Extend Should Cost Calculation

  1. Select the should cost calculation in the Structure view.

    The Details view of your should cost calculation is shown.

  2. In this Details view, enter the following values:
    Part Number16001
    Label (de)Motorwelle
    Label (en)Motor Shaft
    Reference Date07/07/2017
    Carry Over Part
    Project NameMotor
    Project Number10000
    Assumptions
    Number of Production Batches4 lot / a
    SoP01/01/2018
    EoP07/31/2023
    ValuationAggregation
    Assumptions ► Quantity Adjustments
    Additional Production Quantity500 pc / a
    Scrap Production Quantity20 pc / a
    Assumptions ► Location Factors ► Business Days
    Miscellaenous Non-Business Days2 d / a
    Holidays11 d / a
    Overhead and Scrap Rates
    Material Scrap Rate2 %
    Manufacturing Scrap Rate3 %
    Miscellaneous Overhead Cost Rate2 %
    Outbound Logistics
    IncotermsDDP (Delivered Duty Paid)
    Delivery LocationWorld » Europe » Czech Republic » City of Prague
    Cost of Packaging0.02 EUR / pc
    Transport0.06 EUR / pc
    Customs0.04 EUR / pc
    Terms of Payment
    Payment Period60 d
    Cash Discount Rate2 %
    Technical Data
    SupplierABC
    ClientCBA
    Calculation Maturity DegreeInitial Cost Indication
    Measure Evaluation ScenarioIL 2-5
    Drawing Date08/08/2016
    Drawing Number16001a
    Drawing Revision Indexa
  3. You can also attach files to the target cost calculation. Closedsee Attach Files and Hyperlinks

Next step: Insert Material