Secondary Cost Center 
Description
The Secondary Cost Center is that cost center of a company, which is not directly related to an operational business purpose. For these Secondary Cost Centers, FACTON determines Personnel Costs per Employee and Non-Personnel Costs per Employee via value rules. This determination is requires the following information:
- Industrial Sector (on the calculation level)
- Reference Location (on the calculation level)
- Labor Group (on the Secondary Cost Center level)
Further information, see: Build a Overhead Rate Calculation
Examples
- Storage employee (material cost center)
- Development engineer (research and development cost center)
- Distribution employee (sales cost center)
Insertion positions
Calculation Element | Should Costing |
---|---|
![]() |
x |
Quantity Type
Secondary cost centers have the quantity type »currency«.
Properties
You can find the basic properties of the
Further information, see: Labor Rate Calculation