"Save As" dialog
Use this dialog to save a project (copy) under a new name and in a different folder.
Open the "Save As" dialog
- Open the project.
- In the ribbon, click on File > Save as (F12).

Dialog elements without group
-
Structure view
Displays a structure view of the project folders. The project is saved in the highlighted folder.
-
"Name" input field with language selection field
Display and enter the name you wish to use for saving the project.
The language combobox allows you to enter the name in multiple languages. For more information on multilingualism, see Multilingual Names.
-
Project Currency
Selection of the project currency with which the project will be saved.
Options
You can only enter these options if they are activated in the system settings.
-
"Sub-projects" group
This group enables you to define how the sub-projects will be added to the new project.
-
"Copy all" option (default setting)
Select this option if you want to save all sub-projects as new projects - with the current revision status.
-
"Copy first level" option
Select this option if you only want to save sub-projects from the first level as new projects. References are created to all additional projects.
-
"Reference all" option
Select this option if you want to save all sub-projects as a reference. You can open the referenced projects via the new project.
-
-
"Versions" group
This "Versions" group lets you define how existing versions will be added to the new project.
-
"Copy" option (default setting)
Select this option if you want to save existing versions as a new project - with the current revision status.
NoteYou can only copy versions that you at least have read privileges for.
-
"Reference" option
Select this option if you want to save existing versions as a reference in the new project.
-
Dialog elements without group
-
"Use defined project currency for sub-projects and versions" checkbox
- Activated checkbox: All sub-projects and versions assume the defined currency of the new project.
- Deactivated checkbox: Sub-projects and versions keep their initial project currency.
-
"Copy Costing Types" checkbox
Activate this checkbox if you want to copy existing costing types in the new project.
-
"Copy folder structure" checkbox
This checkbox only applies to multi and assembly projects.
- Activated checkbox: The sub-projects are copied along with the folders they are located in.
- Deactivated checkbox: The sub-projects are copied without their folders into the same folder of the multi or assembly project.
-
"Keep the top-level assembly name" checkbox
- Activated checkbox: Top-level assembly keeps the name of the initial project.
- Deactivated checkbox: Top-level assembly assumes the name of the new project.